Please use this identifier to cite or link to this item: http://earchive.tpu.ru/handle/11683/2370
Title: Technique automated of diagram construction in business process management systems
Authors: Ozerova, I. G.
Dmitrieva, E. A.
Tsapko, G. P.
Vichugov, V. N.
Keywords: automated of construction; diagrams; management systems; business processes; enterprises; functional models; reengineering; quality management system; automated transformations; files
Issue Date: 2007
Publisher: Томский политехнический университет
Citation: Technique automated of diagram construction in business process management systems / I. G. Ozerova [et al.] // Bulletin of the Tomsk Polytechnic University. — 2007. — Vol. 311, № 5. — [P. 46-50].
Abstract: Technique allowing reducing stages of analysis and design of application while implementing Business Process Management System (BPMS) has been suggested. It was possible due to elimination of enterprise activity examination stage and formation of business process models on the basis of structural functional models obtained as a result of reengineering project or developing quality management system. The required steps of model construction in BPMS were revealed. Appropriateness of business process modeling with the help of traditional meansand further use of models for transfer into BPMS by conversion was validated. Algorithm of automated transformation on the basis of processing XML-files of models was suggested
URI: http://earchive.tpu.ru/handle/11683/2370
Appears in Collections:Известия Томского политехнического университета. Инжиниринг георесурсов

Files in This Item:
File Description SizeFormat 
bulletin_tpu-2007-311eng-5-10.pdf390,88 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.