Пожалуйста, используйте этот идентификатор, чтобы цитировать или ссылаться на этот ресурс: http://earchive.tpu.ru/handle/11683/64390
Полная запись метаданных
Поле DCЗначениеЯзык
dc.contributor.authorFedyushkin, Kirillen
dc.contributor.authorKarapuzov, Ivanen
dc.date.accessioned2021-02-09T18:38:39Z-
dc.date.available2021-02-09T18:38:39Z-
dc.date.issued2021-
dc.identifier.citationFedyushkin K. The fight with hydrate formation during the operation of wells at the Tagulsky field / K. Fedyushkin, I. Karapuzov // Journal of Economics and Social Sciences. — 2021. — № 17. — [8 p.].en
dc.identifier.issn2312-2978-
dc.identifier.urihttp://earchive.tpu.ru/handle/11683/64390-
dc.description.abstractAt the moment, during the operation of wells in a mechanized way at the Tagulskoye field, there are formation's problems of hydrates, solid deposits that block the passage. Hydrate deposits form in the Christmas tree check valve, blocking the annulus gas passage. In the case of a closed annular space, the gas flowing through the annular space accumulates and squeezes out the dynamic level before accepting the installation of an electric centrifugal pump (ECP), which in turn leads to the ingress of gas into the ECP, disruption of the supply and shutdown of the pump. In turn, this leads to a possible failure of the installation, because due to a possible shutdown, the pump can jam and no longer start, which in turn will lead to additional costs for well servicing and workover. (WSW) and a decrease in current oil production. The fight against hydrate formation in the check valve of the Christmas tree is carried out using heating cables, valve induction heaters (IVH), as well as injection of a hydrate formation inhibitor - Dehydrate 4010. The methods were adopted as the situation with hydrate formation became more complicated, that is, at the initial stage of well operation, to avoid complications, there was enough heating cable used in the upper well piping to increase the temperature of the pipeline and prevent water freezing in the metering branch, while the well was not being measured But as the water cut of the well production increased, it was necessary to install the VIH, and soon install the dehydrate4010 inhibition units. As you can see, to reduce the equipment located on the Christmas tree, it is necessary to come up with another way to avoid the formation of hydrates.en
dc.format.mimetypeapplication/pdf-
dc.language.isoenen
dc.publisherTomsk Polytechnic Universityen
dc.relation.ispartofJournal of Economics and Social Sciences. 2021. № 17en
dc.rightsinfo:eu-repo/semantics/openAccess-
dc.rightsAttribution-NonCommercial 4.0 Internationalen
dc.rights.urihttps://creativecommons.org/licenses/by-nc/4.0/-
dc.sourceJournal of Economics and Social Sciencesen
dc.subjecthydrate formationen
dc.subjectcomplications in oil and gas condensate productionen
dc.subjectcollection and transportationen
dc.subjectinduction heatingen
dc.subjecttemperature fieldsen
dc.titleThe fight with hydrate formation during the operation of wells at the Tagulsky fielden
dc.typeArticleen
dc.typeinfo:eu-repo/semantics/article-
dc.typeinfo:eu-repo/semantics/publishedVersion-
dcterms.audienceResearchesen
local.filepathjess-372.pdf-
local.identifier.bibrecRU\TPU\prd\288566-
local.issue17-
local.localtypeСтатьяru
Располагается в коллекциях:Journal of Economics and Social Sciences

Файлы этого ресурса:
Файл Описание РазмерФормат 
jess-372.pdf794,56 kBAdobe PDFПросмотреть/Открыть


Лицензия на ресурс: Лицензия Creative Commons Creative Commons