Please use this identifier to cite or link to this item:
http://earchive.tpu.ru/handle/11683/35181
Title: | Vertical section construction of wells at Kuyumbinsky oil field via percussive-rotary drilling with DTH hammer |
Authors: | Buzanov, K. V. Nechaeva, Larisa Nikolaevna Ulyanova, Oksana Sergeevna |
Keywords: | вертикальные разрезы; скважины; ударно-вращательное бурение; нефтяные месторождения; буровые растворы; ресурсосберегающие технологии |
Issue Date: | 2016 |
Publisher: | IOP Publishing |
Citation: | Buzanov K. V. Vertical section construction of wells at Kuyumbinsky oil field via percussive-rotary drilling with DTH hammer / K. V. Buzanov, L. N. Nechaeva, O. S. Ulyanova // IOP Conference Series: Earth and Environmental Science. — 2016. — Vol. 43 : Problems of Geology and Subsurface Development : XX International Scientific Symposium of Students, Postgraduates and Young Scientists, 4–8 April 2016, Tomsk, Russia. — [012072, 7 p.]. |
Abstract: | The article presents the analysis of sequential use of mobile percussive-rotary drilling sets with DTH hammer and bottom-hole cleaning by foam mud in construction of vertical sections along with at Kuyumbinsky oil field. On the basis of the analysis, an engineering solution is proposed to prevent disastrous mud loss that is the key factor of efficiency in implementation of resource-saving technologies. |
URI: | http://earchive.tpu.ru/handle/11683/35181 |
Appears in Collections: | Материалы конференций |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
dx.doi.org-10.1088-1755-1315-43-1-012072.pdf | 1,34 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.