Please use this identifier to cite or link to this item:
http://earchive.tpu.ru/handle/11683/2215
Title: | Complex analysis of planning the power station equipment repair in generating companies |
Authors: | Belyaev, L. A. Belyaev, L. A. Zavorin, Aleksandr Sergeevich Kosyakov, S. A. Krivoguzov, K. A. |
Keywords: | сomplex analysis; planning; power stations; repair; equipment; generating companies; thermal power stations; markets of energy; financial resources; algorithms; repair works; sources; control |
Issue Date: | 2007 |
Publisher: | Томский политехнический университет |
Citation: | Complex analysis of planning the power station equipment repair in generating companies / L. A. Belyaev [et al.] // Bulletin of the Tomsk Polytechnic University. — 2007. — Vol. 311, № 4 : Power engineering. — [P. 134-138]. |
Abstract: | The problem of planning the thermal power station equipment repair in conditions of transition to adjustable markets of energy has been analyzed. The bases of applying the system approach in conditions of real restrictions by financial resources are stated. The method based on classification of sources of repair work initiation and considering priorities of works for different control levels is offered as a scheduling algorithm. |
URI: | http://earchive.tpu.ru/handle/11683/2215 |
Appears in Collections: | Известия Томского политехнического университета. Инжиниринг георесурсов |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
bulletin_tpu-2007-311eng-4-32.pdf | 492,94 kB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.