Please use this identifier to cite or link to this item: http://earchive.tpu.ru/handle/11683/57683
Title: Modeling a Stress Condition of Ore Massif in the Process of Bauxite Deposits Development in the Mines of "Sevuralboksitruda"
Authors: Kosukhin, N. I.
Sidorov, D. V.
Gil, Ludmila Boleslavna
Keywords: моделирование; напряженные состояния; бокситовые месторождения; рудники; рудные массивы; программное обеспечение; опоры; бурение скважин
Issue Date: 2019
Publisher: IOP Publishing
Citation: Kosukhin N. I. Modeling a Stress Condition of Ore Massif in the Process of Bauxite Deposits Development in the Mines of "Sevuralboksitruda" / N. I. Kosukhin, D. V. Sidorov, L. B. Gil // IOP Conference Series: Materials Science and Engineering. — Bristol : IOP Publishing, 2019. — Vol. 582 : Innovative Technologies in Engineering : X International Scientific and Practical Conference, 23–25 May 2019, Yurga, Russian Federation : [proceedings]. — [012030, 8 p.].
Abstract: The publication examines the problems of concentrator of elevated tension formation in pillars and ore massif. The article presents the results of modeling the stress state of interchamber pillars and ore deposits, using specialized geomechanical software PRESS 3D URAL. In the process of numerical experiments, it was found that the increase of natural flexibility in pillars leads to a decrease of normal stresses in comparison with the variant of a stiff scheme. If interchamber pillar involves different varieties of ores, there is a redistribution of stress on the site with more stiff ores. The article shows that the stress state control of interchamber pillars and ore massif in conditions of OJSC "Sevuralboxitruda" can be achieved by drilling relief holes.
URI: http://earchive.tpu.ru/handle/11683/57683
Appears in Collections:Материалы конференций

Files in This Item:
File Description SizeFormat 
dx.doi.org-10.1088-1757-899X-582-1-012030.pdf1,08 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.